Bankable Feasibility Study: Burgersfort Ring Road, Fetakgomo Tubatse Local Municipality
–
projected reduction in R37 corridor congestion
monthly collection target hit consistently
reduction in aged estimate backlog (BP443)
The Story
Infrastructure shapes economic destiny. Ntiyiso Industrialisation Consulting was commissioned to conduct
comprehensive engineering analysis and design for the proposed Burgersfort Ring Road, a critical
intervention to address transport bottlenecks constraining economic activity in Fetakgomo Tubatse Local
Municipality. The severely congested R37/R555 corridor was presenting hazardous conditions and actively
blocking urban growth, land development, and economic productivity.
What We Did
Significance
This engagement demonstrates Ntiyiso’s capacity to deliver technically rigorous, investor-ready
infrastructure plans that bridge the gap between municipal ambition and bankable projects, transforming
transport bottlenecks into catalysts for regional economic revival.


