Empowering Institutions that enable Africa’s development

Call us: (010) 261-5100

Bankable Feasibility Study: Burgersfort Ring Road, Fetakgomo Tubatse Local Municipality

1 %

1 %

projected reduction in R37 corridor congestion

R 1 M

monthly collection target hit consistently

+ 1 K

reduction in aged estimate backlog (BP443)

Ready to achieve similar results?

Connect with one of our consultants.

The Story

Infrastructure shapes economic destiny. Ntiyiso Industrialisation Consulting was commissioned to conduct
comprehensive engineering analysis and design for the proposed Burgersfort Ring Road, a critical
intervention to address transport bottlenecks constraining economic activity in Fetakgomo Tubatse Local
Municipality. The severely congested R37/R555 corridor was presenting hazardous conditions and actively
blocking urban growth, land development, and economic productivity.

What We Did

Conducted technical and economic analysis to validate the optimal ring road route
Completed preliminary design and 30% detailed design with full cost estimates
Performed environmental and geotechnical assessments, adapting road alignments where soil conditions required
Secured landowner agreements and initiated servitude acquisition processes
Progressed wayleave applications with SANRAL, Transnet/PRASA, and RAL
Integrated climate-resilient and maintenance-friendly design features throughout
Explored PPP and blended financing models to bridge the municipal funding gap

Significance

This engagement demonstrates Ntiyiso’s capacity to deliver technically rigorous, investor-ready
infrastructure plans that bridge the gap between municipal ambition and bankable projects, transforming
transport bottlenecks into catalysts for regional economic revival.

x

Contact Us!

Head Office:
2nd Floor, Block G, Hertford Office Park, 90 Bekker Rd, Vorna Valley, Midrand, 2196

KZN Office:
Unit 04 Upper Basement, Skye Development, Umhlanga Ridge, Umhlanga 4319

New Business:
(010) 261-5100

Mon – Fri: 8.00am – 17.00pm
Holidays : Closed